Openings & alterations · Midlands

Propped opening with beam and columns

Wide internal opening formed in a fit out, with beam and encased columns installed behind full temporary propping.

Red oxide steel beam and columns forming a wide internal opening with temporary acrow props still in place

About this job

The floor above was propped across the full width before anything was cut, so the load was held while the opening was formed.

The beam and columns went in and were packed and bolted, then the props were struck once the steel was taking the load.

[CONFIRM: project details, dates and client permission to publish]

What we did

  • Temporary propping installed
  • Beam and columns fitted
  • Props struck once loaded
Structural Steel

More photos from this job

New dark grey steel beams and columns on props carrying a wall opening in a stripped out basement fit out

Need a price on a job?

Send us the drawings or just tell us what you are after. We will come back to you with a price and a realistic date.

Monday to Friday 7am to 5:30pm, Saturday 7am to 5pm

Call 087 318 9472Get a Quote