Structural steel · Midlands

Galvanised floor beams, new build house

First floor steel for a new build, galvanised for a long life and sat on prepared bearings.

Galvanised steel floor beams bolted onto red painted supports over blockwork walls on a new build house

About this job

The beams were sized off the engineer's spec, galvanised, and delivered with the supports already welded and painted so the block layers were not held up waiting on steel.

Everything was levelled and bolted off on site by our own fitters before the floor went down.

[CONFIRM: project details, dates and client permission to publish]

What we did

  • Floor beams and supports
  • Base plates and bearings
  • Set and levelled on site
Structural Steel

Need a price on a job?

Send us the drawings or just tell us what you are after. We will come back to you with a price and a realistic date.

Monday to Friday 7am to 5:30pm, Saturday 7am to 5pm

Call 087 318 9472Get a Quote