Structural steel · Midlands

New build steel frame, columns and beams

Columns set out on pads with beams and a goal post frame delivered in sequence for a large new build extension.

Red oxide painted steel columns set on pad foundations with beams laid out ready for erection on a new build site

About this job

The steel was fabricated and painted in red oxide primer, then delivered in the order the builder needed it so nothing had to be double handled around the site.

Columns were set and levelled on the pad foundations first, with the beams and the goal post frame following as the blockwork came up around them.

[CONFIRM: project details, dates and client permission to publish]

What we did

  • Columns set on pad foundations
  • Beams delivered in erection order
  • Goal post frame to opening
Structural Steel

Need a price on a job?

Send us the drawings or just tell us what you are after. We will come back to you with a price and a realistic date.

Monday to Friday 7am to 5:30pm, Saturday 7am to 5pm

Call 087 318 9472Get a Quote