Structural steel · Midlands
New build steel frame, columns and beams
Columns set out on pads with beams and a goal post frame delivered in sequence for a large new build extension.

About this job
The steel was fabricated and painted in red oxide primer, then delivered in the order the builder needed it so nothing had to be double handled around the site.
Columns were set and levelled on the pad foundations first, with the beams and the goal post frame following as the blockwork came up around them.
[CONFIRM: project details, dates and client permission to publish]
What we did
- Columns set on pad foundations
- Beams delivered in erection order
- Goal post frame to opening