Structural steel · Midlands
Galvanised floor joists, new build
Galvanised joists bolted off primed beams to form a full first floor deck on a new build.

About this job
Main beams went in first, then the galvanised joists were bolted off cleats at the centres needed for the floor deck above.
Everything was checked for level as it went in, so the floor was flat before the deck was laid.
[CONFIRM: project details, dates and client permission to publish]
What we did
- Beams set on blockwork
- Galvanised joists at set centres
- Bolted cleat connections
More photos from this job