Fabrication · Midlands
Factory floor guide rails and trackway
Long runs of yellow painted steel guide rail fabricated and bolted into a working production hall.

About this job
Rails were made in sections that could be handled inside the building, with the joints set out so they landed away from the busiest crossing points.
Installation was worked around production, section by section, so the hall stayed in use throughout.
[CONFIRM: project details, dates and client permission to publish]
What we did
- Set out on site
- Rails fabricated in sections
- Drilled and bolted to the slab