Openings & alterations · Midlands

Braced goal post frame, commercial fit out

Braced goal post frame stood inside a live commercial fit out, taken in through the building in sections.

Red oxide painted steel goal post frame with cross bracing standing inside a commercial fit out with services overhead

About this job

The frame was made in sections small enough to be carried in past the other trades, then bolted together in position.

Cross bracing was added to the columns so the frame stands on its own while the opening is formed, with the base plates bolted down to the slab.

[CONFIRM: project details, dates and client permission to publish]

What we did

  • Frame fabricated in sections
  • Cross bracing to columns
  • Base plates bolted to slab
Structural Steel

Need a price on a job?

Send us the drawings or just tell us what you are after. We will come back to you with a price and a realistic date.

Monday to Friday 7am to 5:30pm, Saturday 7am to 5pm

Call 087 318 9472Get a Quote