Structural steel · Midlands

Apex portal frame over blockwork

Painted apex frame with rafters, ties and columns, marked up in the workshop and erected in one visit.

White painted apex steel portal frame with rafters and ties erected on red columns above new blockwork walls

About this job

Every member was marked in the workshop against the erection drawing, so the frame went together in the right order without head scratching on site.

Columns were set on prepared bases and packed to level before the rafters went on, then the whole frame was lined and bolted off ready for the roof.

[CONFIRM: project details, dates and client permission to publish]

What we did

  • Columns, rafters and ties
  • Members marked for erection
  • Bolted up on site by our crew
Structural Steel

Need a price on a job?

Send us the drawings or just tell us what you are after. We will come back to you with a price and a realistic date.

Monday to Friday 7am to 5:30pm, Saturday 7am to 5pm

Call 087 318 9472Get a Quote